Recently, the heating equipment purchased by the government and schools in Zhuoni County, Gansu Province has been assembled and is ready to be delivered. This project will provide warmth to an area of 12,000 square meters, adopting 2 sets of 300kW and 2 sets of 150kW Sinton Group oil-electric exchange boilers to meet the heating demand.
It is understood that the project is also equipped with a smart cloud control system, which can realize functions such as data acquisition and fault alarm. This system will monitor the operation of the heating equipment in real time to ensure the stable operation of the heating system. At the same time, the fault alarm function can detect and report equipment faults in a timely manner, so that staff can carry out rapid repairs to ensure the uninterrupted supply of heating services.
After the heating equipment arrives at the local, it will effectively improve the heating quality of the government and schools in Zhuoni County, providing a more comfortable and warm working and learning environment for the vast number of teachers and students and government staff. At the same time, this project also demonstrates the advanced technology and excellent performance of Sinton Group oil-electric exchange boilers in the heating field, providing a reference experience for other heating projects in the region.
We believe that with the joint efforts of all parties, the centralized heating equipment will be put into use smoothly, bringing reliable guarantees for the winter heating in Zhuoni County.